A flow level configuration is a single step of the charge flow.
To determine the next level configuration the following steps are taken:
The priority of the current level configuration is selected.
All level configuration of a particular flow are sorted ascending.
We choose the level configuration with the next higher priority as the one of the
current level configuration. In case there is no such level configuration the transaction is considered as Failed
.